Grease Interceptor Sizing in Alberta: The Bylaw Requires the Tank, the Flow Rate Decides the Size

Last updated: November 7, 2026

Grease Interceptor Sizing

Every authority in Alberta requires a grease interceptor at a commercial kitchen. None of them publishes a tank size. The size is an output of a flow rate calculation done on the fixtures upstream, and until somebody runs that calculation, the plant cannot quote a tank.

This matters because the order arrives at the plant backwards. A specifier asks for “a grease interceptor” the way they would ask for a septic tank. A septic tank is sized by occupancy. An interceptor is sized by litres per minute. The two numbers come from different documents and different people.

What the code requires, and what it leaves open

The requirement is clear. The sizing is not.

The National Plumbing Code of Canada 2020 is the plumbing code in force in Alberta, effective April 1, 2023, administered under the Safety Codes Act by Alberta Municipal Affairs. It requires an interceptor where a fixture discharges fat, oil, and grease. It does not hand you a tank volume.

Municipal bylaws then layer on their own requirements. Both major Alberta cities require the interceptor and both point at a standard rather than at a size.

AuthorityInstrumentWhat it requiresDoes it print a size?
Province of AlbertaNational Plumbing Code of Canada 2020, in force April 1, 2023An interceptor where fixtures discharge FOGNo
City of CalgaryWastewater Bylaw 14M2012, s. 27Design and sizing to ASME A112.14.3-2022 / CSA B481.1:22 and the National Plumbing CodeNo
City of EdmontonBylaw 20865, EPCOR Code of Practice for Commercial/Institutional Food Preparation, v. 3.0Sufficient capacity based on combined maximum flow rate for all fixturesNo

Three authorities. Three requirements. Zero published tank dimensions.

Two kinds of interceptor, one performance standard

The standard the bylaws name does not cover the tank most sites install.

A hydromechanical grease interceptor (HGI) is a manufactured unit with a managed flow rate. It is compact, it carries a rated flow capacity on a permanent label, and it is normally installed inside the building, on or recessed into the floor. HGIs have a national performance standard: the CSA B481 series, scoped to units up to a 100 gpm flow rate.

A gravity grease interceptor (GGI) is the large in-ground tank. Influent flow is uncontrolled. Separation relies on gravity and time, with a minimum of roughly 30 minutes of retention. GGIs sit outside the building because of their size and the nature of their maintenance. They have no applicable performance standard.

Hydromechanical (HGI)Gravity (GGI)
FlowManaged, rated, labelledUncontrolled
Separation mechanismBaffles and design featuresGravity and retention time
Typical locationInside, on or in the floorOutside, below grade
Performance standardCSA B481 seriesNone applicable
Typical constructionManufactured plastic or steelPrecast concrete
Sized byRated flow capacityFlow rate plus retention

This is the gap that produces most bad orders. The bylaw names a certification. The certification applies to a product class that is not the precast tank. So when a site needs a tank rather than an under-sink unit, the certification route closes and the flow calculation becomes the only path to a number.

Edmonton addresses this directly. The EPCOR Code of Practice requires the interceptor to be CSA-B481 Series 12 certified or assembled to CSA-B481-12, unless EWSI approves otherwise. For a precast gravity tank, that approval is the step. It happens before the pour, not after delivery.

How Calgary says to size it

Calgary publishes a method. It is arithmetic on the fixtures, and it produces litres per minute.

The City of Calgary’s best management practices for food service establishments set out the sequence:

  1. Identify every fixture connected to the interceptor. A dishwasher may need its own dedicated unit.
  2. Calculate each fixture’s volume from its dimensions: depth times length times width.
  3. Convert cubic metres to litres by multiplying by 1,000.
  4. Take 75 percent of each volume by multiplying by 0.75.
  5. Assume one minute to drain a full fixture. Sum the values. That sum is the peak flow rate in litres per minute.

An interceptor rated above that peak flow rate should be adequate.

The City’s own worked example:

FixtureVolumeLitresAt 75 percent
Sink One0.4 cubic metres64 L48 L
Sink Two0.3 cubic metres27 L20.25 L
Combined peak flow68.25 L per minute

Two facts travel with that number. Most interceptors are rated in gallons per minute, so a unit conversion is usually required. And wastewater temperature must stay below 60 degrees Celsius, because hot water carries grease through an interceptor instead of letting it separate.

Installation in Calgary is done by a licensed plumber under a plumbing permit issued by a City plumbing and gas inspector. The City grants no exemptions. Any fixture capable of releasing any amount of FOG must be connected to an interceptor.

How Edmonton says to size it

Edmonton gives the same instruction in different words and adds rules that change the tank count.

Under the EPCOR Code of Practice, the interceptor must have sufficient capacity and appropriate design based on the combined maximum flow rate for all fixtures. A certified plumber can advise on it. No minimum capacity figure appears.

Four Edmonton rules change what gets ordered:

  • The interceptor goes on every fixture that may release FOG or solids, or downstream of all of them.
  • A dishwasher connected to the interceptor needs its own dedicated interceptor, unless EWSI approves otherwise. A dishwasher can mean a second tank.
  • A garburator cannot connect to the interceptor unless a separate solids interceptor sits upstream of it.
  • The unit must carry a permanent label showing its rated flow capacity, or arrive with an accessible manufacturer’s manual and installation drawings.

The last one matters for precast. A tank cast to a flow calculation has no manufacturer’s rating plate in the way a catalogue HGI does. The documentation package substitutes for the label, so it has to exist at delivery.

The published numbers govern maintenance, not size

Where Alberta authorities do print hard numbers, the numbers are about servicing.

RequirementCalgaryEdmonton
Cleaning intervalAt least every four weeks, or as the Director, Water Services requiresAt least monthly, unless EWSI specifies otherwise
Trigger for earlier cleaningDirector’s directionFOG depth exceeds 25 percent of liquid volume capacity
Service standardRemove 100 percent of contents, clean the unit, inspect componentsKeep fully operational and effective, inspect at each cleaning
Record retentionMinimum two consecutive yearsTwo years, available to EWSI on request
Prohibited practicesEnzymes, bacteria, emulsifiers, solvents, hot waterSolvents, hot water, bacteria, enzymes, without approval

Calgary attaches specified penalties: $2,000 for failing to install or to select a properly designed interceptor, $1,500 for failing to maintain and clean, $500 for log failures, and $1,000 for failing to comply with a remedial order.

Read the 25 percent rule as a design input, not just an operating rule. A tank sized tight to peak flow reaches 25 percent FOG depth sooner and gets pumped more often. Capacity bought at the plant is cheaper than capacity bought from a vacuum truck every month for the life of the building. Access for that truck is a site planning decision, and it belongs on the drawing before the tank is cast.

Why the tank is specified by flow, not by catalogue

A precast interceptor is a tank with internal baffles, a defined inlet and outlet invert, access openings, and a cover rated for its traffic exposure. All of those come off the flow number and the site.

Flow sets liquid volume and retention. Depth of cover and traffic loading set wall thickness and lid rating. Invert elevations set barrel height. None of it is a catalogue pick, which is why the same conversation happens with precast box culverts and with precast trench drain: the product is defined by a hydraulic number and a load class, and the drawing follows both.

Concrete is the material of choice here for the same reasons it wins for septic tanks over poly. Mass resists flotation when the tank sits in a high water table. Wall stiffness carries traffic loading in a parking area. Service life matches the building rather than a replacement cycle. We have cast tanks of this kind for Alberta sites for decades, across hundreds of commercial projects.

Where this article stops

This article covers who requires an interceptor in Alberta, how Calgary and Edmonton say to size one, and what the plant needs to cast it.

It does not do the following:

  • It does not size your interceptor. The flow calculation is the plumber’s work and the design is the engineer’s, because both carry responsibility for the result.
  • It does not cover HGI selection or indoor under-sink units.
  • It does not cover grease removal devices, the powered units that skim FOG into a separate container.
  • It does not cover oil and grit interceptors for vehicle shops, which run on different limits.
  • It does not reproduce CSA B481 or the National Plumbing Code. Both are copyrighted standards and must be obtained from their publishers.
  • It does not cover bylaws outside Calgary and Edmonton. Smaller Alberta municipalities set their own, and some defer entirely to the plumbing code.

Confirm every number with the authority having jurisdiction for your site before it goes on a drawing.

Ordering: what the plant needs

Send the following and we can quote and schedule:

ItemWhy the plant needs it
Peak flow rate in litres per minuteSets liquid volume and retention
Fixture list, with the dishwasher and garburator flaggedDetermines whether one tank or two
Municipality and authority having jurisdictionDetermines which bylaw and which approval route
Inlet and outlet invert elevationsSets barrel height and pipe penetrations
Depth of cover and traffic exposure over the lidSets lid rating and wall design
Pipe size and material at inlet and outletSets gasket and penetration detail
Water table or groundwater informationSets anti-flotation requirement
Site access for delivery and craneSets rigging and set date
Required in-service dateSets production slot

Lead time runs from the point the flow number and invert elevations are fixed, not from the first enquiry. Sites that send a fixture list and no flow rate wait on the plumber, not on the plant.

Start with the product page for precast tanks, then send the flow number and invert elevations for a quantity quote and a production slot.

FAQ

Does Alberta publish a required grease interceptor size?

No. The National Plumbing Code of Canada 2020 requires an interceptor and municipal bylaws require proper sizing, but no Alberta authority publishes a tank volume. The size comes from a fixture flow rate calculation.

How is the flow rate calculated?

The City of Calgary method: take each connected fixture’s volume in litres, multiply by 0.75, assume a one minute drain time, and sum the results. That sum is the peak flow rate in litres per minute. Choose an interceptor rated above it.

Does CSA B481 apply to a precast gravity interceptor?

The CSA B481 series is written for hydromechanical interceptors and is scoped to units up to a 100 gpm flow rate. Gravity grease interceptors have no applicable performance standard. In Edmonton, a non-certified interceptor requires EWSI approval.

Does a dishwasher need its own interceptor?

In Edmonton, yes. The EPCOR Code of Practice requires a dishwasher connected to an interceptor to have its own dedicated unit unless EWSI approves otherwise. Calgary’s guidance notes a dishwasher may need a dedicated unit. Flag it early, because it can double the tank count.

How often must the interceptor be cleaned?

At least every four weeks in Calgary, and at least monthly in Edmonton. Edmonton also requires earlier cleaning when FOG depth exceeds 25 percent of liquid volume capacity. Both cities require service records kept for two years.

Who installs it?

A licensed plumber, under a plumbing permit. In Calgary the permit is issued by a City plumbing and gas inspector. The plant supplies and sets the tank; the connection and the permit are the plumber’s scope.